In the construction industry, every small difference may lead to the failure of the entire engineering project, and building templates are also an important component.

In the construction industry, every small difference may lead to the failure of the entire engineering project, and building templates are also an important component. The correct method for selecting building templates is as follows:

1. For the construction of buildings with beam column structures, it is recommended to use medium-sized composite building templates. Due to the frequent changes in the cross-section of beams and columns, it is not suitable to use multi-layer boards for cutting, so it is suitable.

2. Medium sized composite building templates can be used for wall formwork. Due to the unified requirements of high-rise building groups of the same type, medium sized composite building templates help to ensure a high usage turnover rate.

3. The core tube of super high-rise or high-rise buildings should use "hydraulic climbing formwork". The climbing formwork process combines the respective advantages of large formwork and sliding formwork. It can rise layer by layer with structural construction, with fast construction speed, saving space and tower crane lifting times, safe high-altitude operation, and no external scaffolding. In terms of construction, it is particularly suitable for the construction of concrete inner tubes of steel structures.

4. It is recommended to use the entire multi-layer board as the building template for the floor slab, and try to use a 15~18mm thick multi-layer building template with phenolic coating as much as possible. The edge of this type of building template is damaged after multiple uses, and it needs to be cut in a timely manner to ensure that the edges of the multi-layer board are flat.